MADERA COUNTY — November 7, 2026. Madera County has filed an intersection improvement plan for Avenue 12 and Road 35 to create left-turn pockets and repair worn pavement.
What would change at the intersection?
The plan widens Avenue 12 to the north near the intersection to make room for turning vehicles, and it adjusts part of Road 35 to meet revised roadway grades. Crews would excavate, compact base material and install new asphalt. The county also proposes new striping and rumble strips.
Another stretch of Avenue 12
The maintenance plan includes surface rehabilitation on Avenue 12 from Gaston Road east for approximately 2,500 feet, with a chip-seal and asphalt overlay. Some additional right-of-way work is expected near the junction.
What the project will not do
The county says there will be no additional through traffic lanes, characterizing the project as a safety and pavement-repair improvement rather than a major roadway capacity expansion. An environmental notice was filed in late October. Construction dates, closures and contractor assignments have not been confirmed in the filing, so drivers should rely on subsequent county work notices for specific travel impacts.
Source: California State Clearinghouse / CEQAnet project filing, October–November 2026.
Help this community newspaper grow
Your support helps build coverage for the people and places this local newspaper serves.
Donate once by card ↗Support Madera News
Choose how to support Madera News:
Credit / Debit Card via StripeChoose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Madera News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Madera News
- Madera County Studies 1.12-Million-Square-Foot Pistacchio Business Park Near Avenue 18½ →
- Madera’s Pomegranate, Fruit and Nut Festival Scheduled November 7 at Fairgrounds →
- Madera Studies Seven Railroad Crossings and Potential Separations Along Union Pacific Line →
- Madera Commercial Buildings Face New Exterior Paint Color Standards →
- Madera’s 2026–27 Budget Sets Aside $22.5 Million for Street Improvements →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.