MADERA — CALIFORNIA58 LOCAL REPORT. Madera is examining opportunities to improve traffic safety and east-west connectivity at seven Union Pacific Railroad crossings between Cleveland Avenue and Ninth Street. The Rail Corridor Improvement Study will examine existing delays, emergency access, walking and bicycle conditions.
What residents should know
Crossings under review include Cleveland Avenue, Central Avenue, Third Street, Fourth Street, Yosemite Avenue, Sixth Street and Ninth Street. Potential grade separations receive particular attention at Cleveland and Yosemite avenues.
The city lists upcoming milestones through 2028: an existing-conditions report in winter 2027, traffic and conceptual engineering studies later in 2027, and a draft and final alternatives and safety report anticipated in winter 2028. These are forecasts subject to revision.
Residents can use English- and Spanish-language online surveys to flag crossing problems and identify improvements they believe are most important. The city plans outreach at the November 7 Pomegranate Festival as part of the study.
A corridor study is not a decision to close, rebuild or elevate any particular crossing. Designs, financing and regulatory work would require further consideration.
Primary source: City of Madera official document or event program. Check future decisions and schedules with the issuing city department.
Help this community newspaper grow
Your support helps build coverage for the people and places this local newspaper serves.
Donate once by card ↗Support Madera News
Choose how to support Madera News:
Credit / Debit Card via StripeChoose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Madera News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Madera News
- Madera County Studies 1.12-Million-Square-Foot Pistacchio Business Park Near Avenue 18½ →
- Madera County Plans Left-Turn Pockets and Road Repairs at Avenue 12 and Road 35 →
- Madera’s Pomegranate, Fruit and Nut Festival Scheduled November 7 at Fairgrounds →
- Madera Commercial Buildings Face New Exterior Paint Color Standards →
- Madera’s 2026–27 Budget Sets Aside $22.5 Million for Street Improvements →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.